Rebates · 7 min read
How to claim the LADWP EV charger rebate
With the federal credit gone, the LADWP rebate is the main money left for a home charger in the City of LA. A guide for filing it yourself: what it pays as of October 2026, the conditions, and how people lose it.

LADWP will pay $1,000 toward a Level 2 charger at home, and more if you’re on a low-income rate. The federal tax credit is gone, so for most City of LA households this rebate is now the main money on the table. The rules are strict, though, and people lose it on technicalities.
This guide is for you, the homeowner, because you’re the one who files the application. We don’t file rebate applications. What we provide is the part the application asks you to prove: a licensed install, the permit, the passed inspection and the invoice.
Figures and rules as of October 2026. Utility programs change, and they can pause or waitlist when the budget runs low. Check LADWP’s current program page before you buy anything.
Is it yours to claim?
If your electric bill says LADWP, yes. That covers North Hollywood, Studio City, Sherman Oaks, Van Nuys and the rest of the City of LA. If your bill comes from Burbank Water and Power, Glendale Water and Power, Pasadena Water and Power or Southern California Edison, this rebate isn’t for you; the section near the end covers those.
What it pays
- $1,000 toward a Level 2 charger.
- An extra $500 if your account is on LADWP’s Lifeline or EZ-SAVE rate.
- An extra $250 if you install a dedicated EV meter.
One rebate per residence. The extra $500 depends on the rate your account is on, so if you think you qualify for Lifeline or EZ-SAVE but your bill doesn’t show it, ask LADWP about enrolling before you apply rather than after. A dedicated EV meter is a separate decision with its own wiring; ask about it at the quote stage, not once the charger is already on the wall.
The conditions
- A licensed electrician does the install. A handyman or a DIY job doesn’t qualify.
- An LADBS electrical permit, finaled. Pulled isn’t enough. “Finaled” means the city inspector has signed it off.
- Two deadlines. Apply within 12 months of buying the charger, and within 6 months of installing it.
- First come, first served. When the money runs low, applications can go on a waitlist.
Step by step
1. Before you buy the charger
Read the current program terms, including any requirements on the charger itself, and keep the itemised receipt. The 12-month clock starts on the purchase date, so don’t buy the charger months before you’ve sorted out the install.
2. Check the panel can take it
A Level 2 charger usually wants a 40 to 60 amp circuit. Whether your panel has room is a load calculation, not a guess. Do I need a panel upgrade for an EV charger goes through the options. If an upgrade is needed, what happens during a panel upgrade explains the steps. Settle that before you buy the charger, since the 12-month clock starts on the purchase date.
3. Paperwork before the install
The LADBS permit has to be pulled before the work starts, and LADWP has its own EV charger request form. Chargers qualify for an express permit, filed online. Both are the installer’s paperwork, separate from the rebate application. When we do the install, we take care of them.
4. Install and inspection
The electrician installs the charger and its circuit, and the LADBS inspector checks it. Until the permit is finaled, you can’t apply, and the 6-month deadline runs from the day the charger goes in.
5. Apply
You send the application to LADWP yourself. Have the charger receipt, the electrician’s invoice, the finaled permit and your LADWP account number ready. The application lists exactly what it wants for the current round, so go by that, and keep a copy of everything you send.
How people lose the rebate
- No permit, or a permit that was pulled and never inspected.
- The wrong installer. A friend who is handy with wiring is not a licensed electrician.
- The clock. A charger bought more than a year before the application, or an application sent more than six months after the install.
- The wrong utility. Following Burbank’s rules in LADWP territory, or the other way round.
- Waiting too long. First come, first served means a late application can land on the waitlist.
- Counting on the federal credit. The 30C credit ended for chargers placed in service after June 30, 2026.
Not on LADWP?
- Burbank (BWP): $200 to $600 toward a charger, plus $750 to $900 toward a panel upgrade.
- Glendale (GWP): $200 to $599 toward a charger, and a panel upgrade rebate that the latest form we’ve seen puts at $800 to $1,000. That form dates from 2024, so confirm with GWP.
- Pasadena (PWP): we couldn’t confirm current figures. Ask PWP directly.
- Edison (SCE): Charge Ready Home pays up to $4,200 toward a panel and an EV outlet, for income-qualified households and disadvantaged communities only.
As with LADWP, you apply to your own utility. Two older programs you may read about online are no longer an option: the state’s HEEHRA panel rebates were fully reserved statewide by February 2026, and the federal 25C and 25D home energy credits ended on December 31, 2025.
What you get from us
We don’t file rebate applications or follow up on them, and only LADWP decides who gets paid. Our part is the install. A licensed electrician does the work. We pull the LADBS permit, fill in LADWP’s charger form and meet the inspector. When the inspection passes, you have the finaled permit and our invoice to go with your application.
Our EV charger installation page covers the install, and the rebates section of our permits and paperwork page links each utility’s own program.
Where this leads
More from Electrical Advice for LA Homeowners
-
Why does half my house have no power?
Half the house dark, the other half fine, and nothing tripped. That pattern points at the power coming into the house. How to tell whose side the fault is on, and what to do until it’s fixed.
-
Burning smell or a warm electrical panel? What to do first.
Heat at the panel means a connection is failing, and it gets worse every time current runs through it. What to do in the next five minutes, how warm is too warm, and what usually causes it.
-
Why are my lights flickering?
Flickering can be a cheap bulb or a loose connection behind the wall, and where it happens tells you which. How to narrow it down, what you can check yourself, and when to call.
-
What happens during a panel upgrade in Los Angeles?
The work and the paperwork get done in a day. Each step in order, from the load calculation to the meter, plus what can change the job and what we need from you.
-
Do I need a panel upgrade for an EV charger?
“You need a 200 amp upgrade” is the most expensive answer to this question, and not the only one. What a charger really asks of an older LA house, and the cheaper options in between.
-
Why does my breaker trip when the AC turns on?
Which breaker trips tells you more than anything else. The usual causes in older Valley houses, the few things you can safely check, and the signs that mean call today.