Power out right now? We’ll be there ASAP. Call (888) 367-6906Call now

Equipment moves & relocations

Moving the machines? Power at both ends.

Moving a machine across the floor or across town is an electrical job at both ends. We disconnect each piece safely, run power to where it’s going, then reconnect and test before production starts again. The riggers move the equipment; we make sure it runs when it lands.

Go Pro Electric electrician wiring a room of equipment racks on a commercial project in North Hollywood
  • Licence class C-10 CSLB electrical contractor
  • Experience 30+yrs on the tools
  • Visits Sameday book when you call

Call us early when

  • 01 You’re moving to a new building
    Every machine needs power waiting at its new spot before moving day.
  • 02 The floor is being rearranged
    New positions mean new circuits and disconnects, and some old ones taken out.
  • 03 A machine is being sold or scrapped
    Disconnected safely, and the circuit made safe or removed.
  • 04 The new building has different power
    Voltage and phase checked against every machine before the move, not after.

Before the move

We need a list of the machines, a photo of each nameplate, the layout for the new space and the dates the riggers are booked. With that we check what the new location has against what every machine needs, and run the power to each spot before anything arrives. Problems found now cost a phone call; found on moving day, they cost production.

Moving day

Each machine is shut down, locked out and disconnected, and every conductor is labelled so it goes back the way it came off. Then the riggers take over.

At the new spot

We reconnect each machine to the power waiting for it, check the voltage and check the rotation on every three-phase motor, then run it before handing it back. You restart production on equipment that has already been tested.

What’s left behind

Circuits that fed machines which aren’t coming back get made safe or taken out, so the next tenant, or the next layout, doesn’t inherit live wires to nowhere.

The process

How a move runs

  1. First

    We see both sites

    What you have now, where it’s going and what the new spot has for power.

  2. In writing

    Price and timeline

    One written price, lined up with the riggers’ dates.

  3. Moving day

    Disconnect and reconnect

    Labelled on the way out, connected and checked on the way in.

  4. Tested

    Running before you restart

    Every machine run, three-phase rotation checked.

Common questions

Can you handle the electrical side of moving to a new building?

Yes. We disconnect each machine safely, get power run at the new location, then reconnect and test everything before you start production. Riggers or a moving company handle the equipment itself.

What do you need from us before an equipment move?

A list of the machines, a photo of each nameplate, the layout for the new space and the dates the riggers are booked. With that we can check the power at the new spot and have it ready before the machines arrive.

Why do three-phase motors need checking after a move?

Reconnect the three phases in a different order and a motor runs backwards. We check rotation on every three-phase motor before it goes back into production, because a pump or a fan spinning the wrong way can do real damage.

What moves the price

  1. How many machines are moving, and how big they are
  2. Whether the new location already has the power they need
  3. Distance from the panel to each new spot
  4. Weekend or after-hours moves
  5. Permits for new circuits at the new location

Same-day visits

Tell us what’s moving, and when.

Call and book a walk-through, or WhatsApp the machine list and the new layout.

(888) 367-6906

Open 24 hours, Sunday to Friday

  • We answer right away.
  • An electrician out the same day.
  • The price before any work starts.
  • We handle permits and paperwork.
  • Photos? WhatsApp (818) 826-9904

Book an electrician

Free estimate. No card, no obligation.

What’s going on?
When should we show up?
Photos (optional)
Up to 6 photos. Got a video? WhatsApp it to (818) 826-9904.

Where should we come?

We use your details only to reply about this job. See our privacy policy.

Photos and videos

Show us what’s going on.

The panel with the door open, the label inside it, or whatever’s acting up. It goes straight to an electrician’s phone.

Send on WhatsApp No WhatsApp? Send a text

Both go to (818) 826-9904. To talk now, call (888) 367-6906.

Before you go

Not sure what you need? Send us a photo.

WhatsApp a photo or video of the panel, the outlet or whatever is acting up. An electrician will tell you what it most likely is and what it takes to fix. Free, and no obligation.

WhatsApp a photo (888) 367-6906

Or we’ll call you

We answer right away. See our privacy policy.