Equipment moves & relocations
Moving the machines? Power at both ends.
Moving a machine across the floor or across town is an electrical job at both ends. We disconnect each piece safely, run power to where it’s going, then reconnect and test before production starts again. The riggers move the equipment; we make sure it runs when it lands.

- Licence class C-10 CSLB electrical contractor
- Experience 30+yrs on the tools
- Visits Sameday book when you call
Call us early when
-
01
You’re moving to a new building
Every machine needs power waiting at its new spot before moving day. -
02
The floor is being rearranged
New positions mean new circuits and disconnects, and some old ones taken out. -
03
A machine is being sold or scrapped
Disconnected safely, and the circuit made safe or removed. -
04
The new building has different power
Voltage and phase checked against every machine before the move, not after.
Before the move
We need a list of the machines, a photo of each nameplate, the layout for the new space and the dates the riggers are booked. With that we check what the new location has against what every machine needs, and run the power to each spot before anything arrives. Problems found now cost a phone call; found on moving day, they cost production.
Moving day
Each machine is shut down, locked out and disconnected, and every conductor is labelled so it goes back the way it came off. Then the riggers take over.
At the new spot
We reconnect each machine to the power waiting for it, check the voltage and check the rotation on every three-phase motor, then run it before handing it back. You restart production on equipment that has already been tested.
What’s left behind
Circuits that fed machines which aren’t coming back get made safe or taken out, so the next tenant, or the next layout, doesn’t inherit live wires to nowhere.
The process
How a move runs
-
First
We see both sites
What you have now, where it’s going and what the new spot has for power.
-
In writing
Price and timeline
One written price, lined up with the riggers’ dates.
-
Moving day
Disconnect and reconnect
Labelled on the way out, connected and checked on the way in.
-
Tested
Running before you restart
Every machine run, three-phase rotation checked.
Common questions
Can you handle the electrical side of moving to a new building?
Yes. We disconnect each machine safely, get power run at the new location, then reconnect and test everything before you start production. Riggers or a moving company handle the equipment itself.
What do you need from us before an equipment move?
A list of the machines, a photo of each nameplate, the layout for the new space and the dates the riggers are booked. With that we can check the power at the new spot and have it ready before the machines arrive.
Why do three-phase motors need checking after a move?
Reconnect the three phases in a different order and a motor runs backwards. We check rotation on every three-phase motor before it goes back into production, because a pump or a fan spinning the wrong way can do real damage.
What moves the price
- How many machines are moving, and how big they are
- Whether the new location already has the power they need
- Distance from the panel to each new spot
- Weekend or after-hours moves
- Permits for new circuits at the new location
Often done together
Same-day visits
Tell us what’s moving, and when.
Call and book a walk-through, or WhatsApp the machine list and the new layout.
(888) 367-6906Open 24 hours, Sunday to Friday
- We answer right away.
- An electrician out the same day.
- The price before any work starts.
- We handle permits and paperwork.
- Photos? WhatsApp (818) 826-9904