Permits & paperwork
Permits, utility forms and inspections. All handled.
Most electrical jobs need a permit, and panel upgrades and EV chargers bring the utility in too. We pull the permit, fill in the paperwork with the city and the utility, and meet the inspector. On a main panel upgrade, the work and the paperwork get done in a day.
- Permit Pulled on every job that needs one
- Utility forms Filed LADWP, BWP, GWP, PWP or Edison
- Inspection Booked and met on site by us
Start here
Which utility am I on?
Look at the logo on your electric bill. That’s the answer, and it decides who issues the permit. If you don’t have a bill handy, this covers the places we work.
| If you live in | Electricity from | Permit from |
|---|---|---|
| City of Los Angeles: North Hollywood, Valley Village, Studio City, Toluca Lake, Sherman Oaks, Van Nuys, Encino, Hollywood, Downtown | LADWP | LADBS |
| City of Burbank | Burbank Water and Power (BWP) | City of Burbank |
| City of Glendale | Glendale Water and Power (GWP) | City of Glendale |
| City of Pasadena | Pasadena Water and Power (PWP) | City of Pasadena |
| Santa Monica, Culver City, Beverly Hills, West Hollywood, Santa Clarita and unincorporated LA County | Usually Southern California Edison (SCE) | Your own city hall, or LA County Public Works (EPIC-LA) |
City of Los Angeles: LADBS and LADWP
Inside the City of LA, EV chargers and service upgrades up to 400 amps go through LADBS express permits, issued online. We file the permit, book the city inspection and meet the inspector.
LADWP has its own paperwork on top: an EV request form for a charger, and its service requirements for a panel or meter change, set out in the Guide to Electric Service (PDF). We fill those in and book any visit LADWP needs, and after the inspection passes, LADWP sets the meter. See panel upgrades.
Burbank: City of Burbank and BWP
Burbank runs its own building department and its own utility, Burbank Water and Power. The permit and the inspection come from the City of Burbank, not LADBS, and the meter side goes through BWP. Different forms, different inspector, same job for us.
Glendale: City of Glendale and GWP
Glendale issues its own permits and inspections, and Glendale Water and Power handles anything at the meter. We file with both.
Pasadena: City of Pasadena and PWP
Pasadena has its own permit office and its own utility, Pasadena Water and Power. The permit, the inspection and the utility’s forms all go through the city, and we handle each of them.
Edison territory
Santa Monica, Culver City, Beverly Hills, West Hollywood and Santa Clarita are usually on Southern California Edison. The permit comes from that city’s own building department, and Edison schedules its own work at the meter. We coordinate with both so the power goes back on when the inspector signs off.
Unincorporated LA County
Outside any city, permits are issued by LA County Public Works through its online system, EPIC-LA, and the power is usually SCE. If you’re not sure who covers your address, we’ll know once we have it.
About rebates
LADWP, Burbank, Glendale, Pasadena and Edison each run their own programs for EV chargers, and some for panel upgrades, and the terms change through the year. We don’t file rebate applications. Most programs ask for a licensed electrician and a finaled permit, though, and you’ll have both from us. Check the current terms with your utility before you buy: LADWP, Burbank, Pasadena, Edison.
The federal charger credit (30C) ended for chargers placed in service after June 30, 2026. IRS: 30C.
How the paperwork runs
You approve the price. We do the rest.
-
Same day
Site visit
We see the job and work out which permit and which utility forms it needs.
-
Paperwork
Permit filed
With your city: LADBS, Burbank, Glendale, Pasadena or the county.
-
Paperwork
Utility forms
Filled in and sent, with any utility visit booked for you.
-
Work day
The work
Done to code, with every circuit labelled.
-
Final
Inspection
We meet the inspector, the permit is finaled, and it’s yours to keep.
Before you book
Common questions about permits
Do I need a permit for a panel upgrade or an EV charger?
Yes. In California both need an electrical permit and a final inspection. We pull it on every job that needs one, and it’s part of the one written price you approve before work starts.
Who issues the permit if I live in Burbank, Glendale or Pasadena?
Your own city. Burbank, Glendale and Pasadena each run their own building department, so the permit and the inspection come from city hall there, not LADBS. We pull it either way. It just means different forms and a different inspector.
Does LADWP charge to disconnect and reconnect my power for a panel upgrade?
Usually not. For a normal residential service upgrade there’s typically no LADWP charge for the disconnect, reconnect and meter work. It can be different if the job involves work on public property, such as a new service line from the street. We’ll flag that before you sign anything.
Can you help with my utility rebate?
We don’t file or manage rebates; that’s between you and your utility. What we do is the part most programs depend on: a licensed install, a permit and a passed inspection, with the paperwork to show for it.
What we do
Same-day visits
Permits and paperwork? That’s our job.
Call and book a same-day visit. We’ll tell you which permit and which utility forms your job needs, and take care of both.
(888) 367-6906Open 24 hours, Sunday to Friday
- We answer right away.
- An electrician out the same day.
- The price before any work starts.
- We handle permits and paperwork.
- Photos? WhatsApp (818) 826-9904