Power out right now? We’ll be there ASAP. Call (888) 367-6906Call now

Electrician · Woodland Hills

Woodland Hills runs hot. Your panel feels it first.

On 6 September 2020 the weather station at Pierce College hit 121°F, the highest temperature ever recorded in Los Angeles County. Summers here push a house’s electrical system harder than almost anywhere else in the city, and the hottest afternoons are when an undersized panel or a tired AC circuit gives up.

  • Visits Sameday book when you call
  • License C-10 CSLB Lic. #1051338

The houses in Woodland Hills

Woodland Hills has two quite different housing pictures. In ZIP 91364, more than three-quarters of homes are single-family houses, and the median one was built in 1967. In 91367, which takes in Warner Center, apartments and condos make up more than half, and the median build year is 1975 (American Community Survey, 2020–2024). Up against the Santa Monica Mountains, the lots get steeper and the driveways longer.

A house from the late ’60s was built with one central AC unit in mind, if any. Since then many have added a second condenser for an upstairs or a converted garage, a pool pump, and now an EV. Each one is fine on its own. Together, on a 100 or 150 amp service, they add up to breakers that trip on a 110-degree afternoon and a main breaker running warm. A load calculation shows whether the fix is a dedicated circuit, a subpanel or a main panel upgrade.

Power, permits and inspections

Woodland Hills is inside the City of Los Angeles, so LADWP supplies the power and LADBS issues the permits. The neighbors are a different story. Calabasas to the west and Topanga to the south are on Southern California Edison, with their own permit offices, so if you’ve lived there before, the process here will feel different.

During a heat wave, outages come from two places. If your street is dark, it’s usually LADWP equipment, such as an overloaded transformer, and LADWP restores it. If just your house or part of it is out, the problem is on your side of the meter: a tripped main, a failed breaker or a burnt connection. That’s an electrical repair call. How LADBS permits and LADWP meter work fit together is on our permits page.

Shops, studios and offices

Warner Center is one of the Valley’s main business districts, with office buildings, shops and restaurants. For tenants we handle suite improvements, added circuits for equipment, lighting and panel work, coordinated with building management. See commercial electrical.

Getting to you

In the hills south of Ventura Boulevard, streets can be steep and narrow, so tell us where to park. For heat-related trouble, a photo of the panel and the AC disconnect outside helps us bring the right parts.

Around Woodland Hills

Next door, and what changes there.

  • Tarzana
    East along Ventura Boulevard. Similar 1960s and ’70s houses, same LADWP and LADBS.
  • Calabasas
    West. Its own city on Southern California Edison, with its own permits. Different paperwork from Woodland Hills.
  • Topanga
    South over the ridge. Unincorporated county on Edison, permitted through LA County Public Works.
  • Canoga Park
    North of Warner Center. City of LA, LADWP and LADBS.

Before you call

Common questions in Woodland Hills

The power went out at my Woodland Hills house during a heat wave. Is it my panel or LADWP?

Check the neighbors first. If their lights are out too, it’s LADWP, and you can report it to them. If it’s only your house, look at the main breaker in your panel. A main that trips in the heat is telling you the house is drawing close to what the service can carry. Don’t keep resetting it. Call us, and we’ll find out whether it’s load, a failing breaker or a loose connection.

Can my Woodland Hills panel handle a second AC unit?

It depends on the size of the service and what else is on it. A second condenser typically needs its own 240-volt circuit, and on a 100 or 150 amp service already running a central AC, a pool pump and an EV charger, the load calculation may come up short. We work it out from the equipment’s nameplate before you buy, so you know whether it’s a new circuit, a subpanel or a panel upgrade.

My Woodland Hills house is near the Calabasas or Topanga line. Am I still on LADWP?

Woodland Hills is a City of Los Angeles neighborhood, so for homes inside it LADWP is the utility and LADBS issues the permit, right up to the city line. Calabasas and Topanga are on Southern California Edison and use different permit offices. Near the edges, a mailing address can say Woodland Hills while the house sits just outside the city, so the electric bill is the quickest way to settle it. We check before we file anything.

Is it worth having my Woodland Hills panel checked before summer?

If the house has had a breaker trip in the heat, a main breaker that feels warm, or a lot of load added since it was built, yes. A check in spring leaves time to fix anything we find. We look for breakers that are discolored or running hot, loose or corroded connections, and how close the AC, pool pump and any charger bring you to the service’s limit. You get a list of what needs attention before the first 100-degree week. See electrical inspections.

Why do our breakers only trip on the hottest Woodland Hills afternoons?

Two things stack up. An air conditioner works harder and draws more current when it’s 110 outside than when it’s 85. And most breakers respond to heat as well as current, so one in a panel on a sun-baked wall or in a hot garage trips sooner than the same breaker would somewhere cool. A breaker that only goes on the worst days usually means a circuit running close to its limit, and sometimes a loose connection that heats up under load. We measure the draw and check the connections and the breaker itself. A bigger breaker on the same wire is never the fix. See electrical repair.

Our Warner Center office needs circuits for more workstations. What does that involve?

First we see what your suite’s panel has spare and what each new circuit will carry. If there’s room, it’s new dedicated circuits under an LADBS permit. If there isn’t, a subpanel for the suite may be the answer, which usually needs the building owner’s sign-off. In an office tower the building also sets the rules on access, work hours and the freight elevator, so we arrange that with management before the work day. See commercial electrical.

Same-day visits

Electrician in Woodland Hills? We can be there today.

Call and book a visit: an electrician can be there the same day. Rather not call? WhatsApp us a photo or video, or book with the form.

(888) 367-6906

Open 24 hours, Sunday to Friday

  • We answer right away.
  • An electrician out the same day.
  • The price before any work starts.
  • We handle permits and paperwork.
  • Photos? WhatsApp (818) 826-9904

Book an electrician

Free estimate. No card, no obligation.

What’s going on?
When should we show up?
Photos (optional)
Up to 6 photos. Got a video? WhatsApp it to (818) 826-9904.

Where should we come?

We use your details only to reply about this job. See our privacy policy.

Photos and videos

Show us what’s going on.

The panel with the door open, the label inside it, or whatever’s acting up. It goes straight to an electrician’s phone.

Send on WhatsApp No WhatsApp? Send a text

Both go to (818) 826-9904. To talk now, call (888) 367-6906.

Before you go

Not sure what you need? Send us a photo.

WhatsApp a photo or video of the panel, the outlet or whatever is acting up. An electrician will tell you what it most likely is and what it takes to fix. Free, and no obligation.

WhatsApp a photo (888) 367-6906

Or we’ll call you

We answer right away. See our privacy policy.