Main panel upgrades (MPU)
Your panel was sized for 1965. Your house wasn’t.
Most Valley homes were wired for a fridge, a TV and some lamps. Add an EV, central air or an induction range and a 60 or 100 amp panel runs out of room. We size it properly, pull the permit and handle the utility.

- Typical move 100→200A amps
- On-site work 6–8hrs power off for part of the day
- Work & paperwork 1day done together
Signs the panel is the problem
-
01
Breakers trip when the AC kicks on
The panel or the circuit is at its limit on a hot afternoon. -
02
You’re buying an EV
A Level 2 charger wants a 40 to 60 amp circuit of its own. -
03
Zinsco or Federal Pacific on the label
Brands that inspectors and insurers flag on sight. -
04
Fuses, not breakers
A fuse box in a house that now runs a home office and a dryer. -
05
An insurer or inspector wrote it up
Often the trigger on a sale or a policy renewal. -
06
Remodel, ADU or new AC
New load means a load calculation before anything else.
Upgrade, replace, or neither
Not every tired panel needs to get bigger. Sometimes a same-size replacement is the right call: the house has enough capacity, but the panel itself is a brand with a bad record or the bus bar is burnt. Sometimes a subpanel or a load-management device solves it for a fraction of the work. And sometimes the honest answer is that the panel is fine and the problem is one overloaded circuit.
We start with a load calculation: what you run now, what you plan to add, and what the service can carry. That number decides the job, not the other way round.
What “service upgrade” actually involves
A bigger panel usually means a bigger service: new service-entrance cable, a new meter base and sometimes a new mast or riser. On an older house that can also mean bringing grounding and bonding up to the current code, which is part of why two quotes for “a 200 amp panel” can be so far apart.
- Load calculation so the size is right, not just bigger.
- Electrical permit. In the City of LA, service upgrades up to 400 amps qualify for an express permit.
- Utility paperwork. We fill in the forms with the utility, whether that’s LADWP, Burbank, Glendale, Pasadena or Edison.
- Swap day. The old panel comes out, the new one goes in, circuits are labelled.
- City inspection, then the utility sets the meter.
The work and the paperwork, in a day
The panel swap itself is usually a single day on site, and the paperwork gets done alongside it: the permit, the forms for the city and the utility, and booking the inspection. You don’t spend your lunch break on hold with the utility. If you’re in Burbank, Glendale, Pasadena or Edison territory the utility and the permit office change; we’ll tell you which applies on the first call.
Planning an EV charger too? Say so when you call. The load calculation covers both, and it often decides the panel size. See EV chargers.
The process
How a main panel upgrade runs
-
Same day
Site visit and load calc
A certified electrician checks the panel, the service and what you plan to add.
-
Written price
You decide
One price for the job, including the permit. Nothing starts until you say yes.
-
Paperwork
Permit and utility
We pull the permit and handle the forms with the city and the utility.
-
Swap day
The new panel goes in
Power is off for part of the day. Circuits come back labelled.
-
Final
Inspection and meter
The city inspects, the utility sets the meter, and you get the signed-off permit.
Common questions
Do I need a 200 amp panel for an EV charger?
Not always. A 100 amp service can sometimes take a charger with a load calculation and a smaller circuit, or with a load-management device that pauses charging when the dryer runs. If the calculation says the house is already near its limit, a 200 amp upgrade is the cleaner fix. We run the numbers before recommending either.
How long will my power be off?
For a straightforward swap, part of one day: usually 6 to 8 hours of work on site. If the utility has to disconnect at the pole or the meter moves, we coordinate the timing with them and tell you the window in advance.
Is a Zinsco or Federal Pacific panel dangerous?
Both brands are widely flagged by home inspectors and some insurers, because their breakers have a reputation for not tripping when they should. There was no federal recall, so nobody will force you to replace one. If you have one, we’ll look at its condition and tell you straight whether it needs replacing now.
Do I have to deal with the utility myself?
No. We fill in the utility’s paperwork, book any visit they need and schedule the inspection. You need to be reachable and give access to the panel and meter.
Who checks the work?
A city inspector. The permit means the new panel is inspected against the current electrical code before the utility restores the meter, and you keep the signed-off permit for your records, your insurer and any future sale.
What moves the price
- Panel size and whether the service (meter, cable, mast) has to grow with it
- Moving the panel. The utility sometimes requires a new meter location
- Grounding and bonding that has to be brought up to the current code
- Stucco or drywall that has to be opened and patched
- How many circuits need new breakers, AFCI or GFCI protection
Often done together
Same-day visits
Start with a same-day site visit.
Call and an electrician can come out today to check the panel and run the load calc. Rather send a photo first? WhatsApp the label inside the panel door and the meter.
(888) 367-6906Open 24 hours, Sunday to Friday
- We answer right away.
- An electrician out the same day.
- The price before any work starts.
- We handle permits and paperwork.
- Photos? WhatsApp (818) 826-9904